Rapid deployment of a water injection line

When the operators of Libya's Zella74B field were researching the installation of an injection line for corrosive water, a solution was needed that could withstand high temperatures and dusty, uncompromising conditions. Something that could be deployed quickly and easily by local staff. A pipeline network that was low maintenance and built for the long term.

They found their solution in a SoluForce pipeline system that comprised SoluForce Heavy H515 pipes and end-fittings, plus the use of an advanced electrofusion system. The 8,800 metre pipeline was installed in record time. Given the specified operating pressure of 1500 psi, the system was hydro-tested at 2000 psi for 24 hours and 2300 psi for four hours. It passed easily and continues to perform to specification.

Facts

Get in Touch

The expert for your region will get in touch with you.

Click here to contact us! We have a worldwide presence.

Downloads

Advanced flexible pipeline systems for oil, gas and water

Download Center
Did you not find what you are looking for?

Frequently asked questions

Find answers to the most common questions here: