An Inter-field Connection with Low CAPEX and no OPEX

A French oil company was looking for a straightforward, reliable, cost-effective and easy-to-deploy solution to connect two of its fields off the coast of west Africa. Naturally they turned to SoluForce for the ultimate solution...

SoluForce Flexible Composite Pipe (FCP) systems are ideal for anyone who wants to minimise CAPEX and eliminate OPEX. For this particular project, 8.8 km of SoluForce Classic was laid in less than two days (at an average speed of 5.5 km a day) and only one deployment carousel was needed. It was assembled onshore, locally, and stabilised on the seabed, 40 metres down, using locally made concrete blocks.

The capital costs were extremely low compared to the alternatives, and because all SoluForce FCP are corrosion free, operational costs were eliminated...

Facts

  • Product: SoluForce Classic M570
  • Length: 8.8 KM
  • Total offshore time: Only 2 days
  • Seabed stabilization: Locally produced concrete blocks
SoluForce Offshore case 1 3

SoluForce Videos

Check out our Youtube channel.

Get in Touch

The expert for your region will get in touch with you.

Click here to contact us! We have a worldwide presence.

Downloads

Advanced flexible pipeline systems for oil, gas and water

Download Center
Did you not find what you are looking for?

Frequently asked questions

Find answers to the most common questions here: