SoluForce uses cookies to adapt the website to your needs. Cookies that are already on your computer can be deleted at any time. Instructions for doing this can be found in your browser settings (under “Help” in your browser menu). Read moreClose
Choose your region
Contact us
Contact us
Required fields are marked with *.
Contact |  Soluforce
Menu

An Inter-field Connection with Low CAPEX and no OPEX

A French oil company was looking for a straightforward, reliable, cost-effective and easy-to-deploy solution to connect two of its fields off the coast of west Africa. Naturally they turned to SoluForce for the ultimate solution...

SoluForce Flexible Composite Pipe (FCP) systems are ideal for anyone who wants to minimise CAPEX and eliminate OPEX. For this particular project, 8.8 km of SoluForce Classic was laid in less than two days (at an average speed of 5.5 km a day) and only one deployment carousel was needed. It was assembled onshore, locally, and stabilised on the seabed, 40 metres down, using locally made concrete blocks.

The capital costs were extremely low compared to the alternatives, and because all SoluForce FCP are corrosion free, operational costs were eliminated...

 

  • Product: SoluForce Classic M570
  • Length: 8.8 KM
  • Total offshore time: Only 2 days
  • Seabed stabilization: Locally produced concrete blocks

Contact us for more information.