SoluForce uses cookies to adapt the website to your needs. Cookies that are already on your computer can be deleted at any time. Instructions for doing this can be found in your browser settings (under “Help” in your browser menu). Read moreClose
Choose your region
Contact us
Contact us
Required fields are marked with *.
Contact |  Soluforce
Menu

Rapid deployment of a water injection line

When the operators of Libya's Zella74B field were researching the installation of an injection line for corrosive water, a solution was needed that could withstand high temperatures and dusty, uncompromising conditions. Something that could be deployed quickly and easily by local staff. A pipeline network that was low maintenance and built for the long term.

They found their solution in a SoluForce pipeline system that comprised SoluForce Heavy H515 pipes and end-fittings, plus the use of an advanced electrofusion system. The 8,800 metre pipeline was installed in record time. Given the specified operating pressure of 1500 psi, the system was hydro-tested at 2000 psi for 24 hours and 2300 psi for four hours. It passed easily and continues to perform to specification.

  • Product: SoluForce Heavy H515
  • Length: 8.8 KM
  • MAOP: 103 bars / 1500 psi
  • Installation: By local staff, trained by the SoluForce Academy

Contact us for more information